| поискавой системы для электроныых деталей |
|
MNSC140CORE датащи(PDF) 40 Page - Freescale Semiconductor, Inc |
|
|
|||||||||||||||||||||||||||||
MNSC140CORE датащи(HTML) 40 Page - Freescale Semiconductor, Inc |
|
40 / 80 page ![]() MSC8102 Quad Core Digital Signal Processor, Rev. 12 2-10 Freescale Semiconductor Specifications 2.5.5 System Bus Access Timing 2.5.5.1 Core Data Transfers Generally, all MSC8102 bus and system output signals are driven from the rising edge of the reference clock (REFCLK). The REFCLK is either the DLLIN signal or, if DLL is disabled, the CLKOUT signal. Memory controller signals, however, trigger on four points within a REFCLK cycle. Each cycle is divided by four internal ticks: T1, T2, T3, and T4. T1 always occurs at the rising edge of REFCLK (and T3 at the falling edge), as Figure 2-6 shows. Figure 2-6 is a graphical representation of the internal ticks. The UPM machine and GPCM machine outputs change on the internal tick determined by the memory controller configuration. The AC specifications are relative to the internal tick. SDRAM machine outputs change only on the REFCLK rising edge. Figure 2-6. Internal Tick Spacing for Memory Controller Signals Table 2-12. AC Timing for SIU Inputs No. Characteristic Value2 Units 10 Hold time for all signals after the 50% level of the REFCLK rising edge 1 ns 11a ARTRY/ABB/TS set-up time before the 50% level of the REFCLK rising edge 4.5 ns 11b DBG/DBB/BG/BR/TC set-up time before the 50% level of the REFCLK rising edge 4.3 ns 11c AACK set-up time before the 50% level of the REFCLK rising edge 5.0 ns 11d TA/TEA/PSDVAL set-up time before the 50% level of the REFCLK rising edge • Pipeline mode • Non-pipeline mode 3.7 5.0 ns ns 12 Data bus set-up time before REFCLK rising edge in Normal mode • Pipeline mode • Non-pipeline mode 2.3 4.9 ns ns 13 Data bus set-up time before the 50% level of the REFCLK rising edge in ECC and PARITY modes • Pipeline mode • Non-pipeline mode 2.6 7 ns ns 14 DP set-up time before the 50% level of the REFCLK rising edge • Pipeline mode • Non-pipeline mode 2.3 6.5 ns ns 15a Address bus set-up time before the 50% level of the REFCLK rising edge • Extra cycle mode (SIUBCR[EXDD] = 0) • No extra cycle mode (SIUBCR[EXDD] = 1) 3.1 6.9 ns ns 15b Address attributes: TT/TBST/TSIZ/GBL set-up time before the 50% level of the REFCLK rising edge • Extra cycle mode (SIUBCR[EXDD] = 0) • No extra cycle mode (SIUBCR[EXDD] = 1) 5.5 7.6 ns ns 161 PUPMWAIT signal set-up time before the 50% level of the REFCLK rising edge 4.0 ns Notes: 1. Synchronous operation. Asynchronous operation may have a higher set-up time. 2. Values are measured from the 50% TTL transition level relative to the 50% level of the REFCLK rising edge. REFCLK T1 T2 T3 T4 |
|
ссылки URL |
| Вашему бизинису помогли Аллдатащит? [ DONATE ] |
Что такое Аллдатащит | реклама | контакт | Конфиденциальность | Ссылка на техническое описание | обмен ссыками | поиск по производителю All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |