| поискавой системы для электроныых деталей |
|
ADE9078ACPZ датащи(PDF) 61 Page - Analog Devices |
|
|
|||||||||||||||||||||||||||||
ADE9078ACPZ датащи(HTML) 61 Page - Analog Devices |
|
61 / 108 page ![]() ADE9078 Data Sheet Rev. 0 | Page 60 of 107 VBC 220V VC 90° 0.353V 90° 3 VBA 220V 30° 0.353V 30° 3 VAC 220V VB 150° 0.353V 150° 3 VCONSEL[2:0] = 100 CALCULATED VA, VB, VC VAP VBP VCP VAN AGND DGND VBN VCN 220V –120° 220V 120° PHASE A PHASE B 220V 0° Figure 93. 3-Wire Delta, Series Impedance on Phase B and VCONSEL = 100 The VA, VB, and VC waveforms computed inside the ADE9078 for the 3-wire delta with series impedance on Phase B and VCONSEL = 100 are shown in the time domain in Figure 93 and correspond to the phasor diagram shown in Figure 92. Phase sequence error detection is performed with the expectation that the VC waveform leads VA (see the Phase Sequence Error Detection section for more information). In a Blondel compliant 3-wire delta meter, only the overall power consumed by the system is meaningful; the individual phase powers are not meaningful because a line current is multiplied by a line to line voltage. To calculate the overall power consumed by the system (active, reactive, and apparent), add the contribution from Phase A and Phase C. APPLYING THE ADE9078 TO A NON-BLONDEL COMPLIANT, 4-WIRE WYE SERVICE To use the ADE9078 in a non-Blondel compliant 4-wire wye service, such as for ANSI Meter Forms 6S, 7S, 14S, 29S, 36S, 46S, 76S, the Phase A and Phase C voltages are measured and the Phase B voltage is calculated, VB = VA − VC. All three phase currents are measured. For this configuration, write VCONSEL = 010 and connect as shown in Figure 94. VAP VBP VCP VAN AGND DGND NEUTRAL VBN VCN VBN VB 220V –120° –120° 0.353V 220V 120° 120° 0.353V PHASE C VCN VC PHASE A PHASE B VAN VA 220V 0° 220V –120° 220V 120° PHASE C PHASE A PHASE B 220V 0° 0.353V 0° VCONSEL = 010 VA, VB, VC Figure 94. Non-Blondel Compliant 4-Wire Wye The phasor diagram follows Figure 83. Phase sequence error detection is performed based on the expected ABC sequence (see the Phase Sequence Error Detection section for more information). To calculate the total power (active, reactive, and apparent), add the contribution from Phase A, Phase B, and Phase C. APPLYING THE ADE9078 TO A NON-BLONDEL COMPLIANT, 4-WIRE DELTA SERVICE To use the ADE9078 in a non-Blondel compliant 4-wire delta service, such as for ANSI Meter Forms 8S, 15S, and 24S, measure the Phase A and Phase C voltages and calculate the Phase B voltage, VB = −VA. All three phase currents are measured. For this configuration, write VCONSEL = 011 in the ACCMODE register and connect as shown in Figure 95. |
|
ссылки URL |
| Вашему бизинису помогли Аллдатащит? [ DONATE ] |
Что такое Аллдатащит | реклама | контакт | Конфиденциальность | Ссылка на техническое описание | обмен ссыками | поиск по производителю All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |