| поискавой системы для электроныых деталей |
|
DM505LRBABF датащи(PDF) 102 Page - Texas Instruments |
|
|
|||||||||||||||||||||||||||||
DM505LRBABF датащи(HTML) 102 Page - Texas Instruments |
|
102 / 295 page ![]() porz vdds18v_ddr1, vdds18v_ddr2, vdds18v_ddr3, vdds18v, vdda_osc, vdda_per, vdda_ddr_dsp, vdda_gmac_core, vdda_csi, vdda_dac, vdda_adc vdds_ddr1, vdds_ddr2, vdds_ddr3 vdd vdd_dspeve vddshv1, vddshv2, vddshv3, vddshv4, vddshv5, vddshv6 xi_osc0 SPRS91 _ELCH_02 6 Note 6 Note 7 Note 9 Note 10 Note 11 DSPEVE voltage CORE voltage EMIF voltage V1 T0 T1 T2 T3 T4 Note 4 Note 5 Note 8 Note 12 102 DM505 SPRS976E – NOVEMBER 2016 – REVISED MAY 2018 www.ti.com Submit Documentation Feedback Specifications Copyright © 2016–2018, Texas Instruments Incorporated (7) If any of the vddshv[1-6] power rails are used for 1.8V I/O signaling, then these rails can be combined with vdds18v_*. If 3.3V I/O signaling is required, then these rails must be the last to ramp following vdd_dspeve. (8) resetn and porz must remain asserted low for a minimum of 12P(12) after xi_osc0 is stable at a valid frequency. (9) Setup time: SYSBOOT[15:0] pins must be valid 2P(12) before porz is de-asserted high. (10) Hold time: SYSBOOT[15:0] pins must be valid 15P(12) after porz is de-asserted high. (11) resetn to rstoutn delay is 2ms. (12) P = 1/(SYS_CLK1/610) frequency in ns. (13) Ramped Up is defined as reaching the minimum operational voltage level for the corresponding power domain. For information about voltage levels, refer to , Recommended Operating Conditions. Figure 5-5. Recommended Power-Down Sequencing (1) T1 ≥ 100 µs; T2 = 500 µs; T3 = 1.0 ms; T4 = 1.5ms; V1 = 2.7 V. All "Tn" markers are intended to show total elapsed time, not interval times. (2) Terminology: – VOPR MIN = Minimum Operational Voltage level that ensures device functionality and specified performance in Section 5.4, Recommended Operating Conditions. – VOFF = OFF Voltage level is defined to be less than 0.6 V where any current draw has no impact to POH. – Ramp Down = transition time from VOPR MIN to VOFF and is slew rate independent. (3) General timing diagram items: – Grey shaded areas show valid transition times for supplies between VOPR MIN and VOFF. – Blue dashed lines are not valid windows but show alternate ramp possibilities based on the associated note. – Dashed vertical lines show approximate elapse times based upon TI recommended PMIC power-down sequencer circuit performance. (4) porz must be asserted low for 100 µs min to ensure SoC is set to a safe functional state before any voltage begins to ramp down. (5) vddshv[1-6] domains supplied by 3.3 V: – must remain greater than 2.7 V to enable Dual Voltage GPIO selector circuit operation for 100 µs min after porz is asserted low. – must be in first group of supplies ramping down after porz has been asserted low for 100 µs min. – must not exceed vdds18v by more than 2 V during ramp down, see Figure 5-6, "vdds18v versus vddshv[1-6] Discharge Relationship". (6) vddshv[1-6] domains supplied by 1.8 V must ramp down concurrently with vdds18v and be sourced from common vdds18v supply. (7) vdd_dspeve domain can ramp down before or concurrently with vdd. (8) vdd must ramp down after or concurrently with vdd_dspeve. (9) vdds_ddr[1-3] domains: – should ramp down after vdd begins ramping down. |
|
ссылки URL |
| Вашему бизинису помогли Аллдатащит? [ DONATE ] |
Что такое Аллдатащит | реклама | контакт | Конфиденциальность | Ссылка на техническое описание | обмен ссыками | поиск по производителю All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |