| поискавой системы для электроныых деталей |
|
SC2620 датащи(PDF) 16 Page - Semtech Corporation |
|
|
|||||||||||||||||||||||||||||
SC2620 датащи(HTML) 16 Page - Semtech Corporation |
|
16 / 26 page ![]() 16 2006 Semtech Corp. www.semtech.com SC2620 POWER MANAGEMENT Applications Information increases to 3.3mA. The current flowing out of the other SS pin (which is still pulled low) increases to 105µA. The fast charging circuit quickly pulls the released soft-start capacitor to 1V (slightly below the switching threshold). The fast charging circuit is then disabled. A 1.8µA current source continues to charge the soft-start capacitor (Figure 3). The soft-start voltage ramp at the SS pin clamps the error amplifier output (Figure 2). During regulator start- up, COMP voltage follows the SS voltage. The converter starts to switch when its COMP voltage exceeds 1.1V. The peak inductor current gradually increases until the converter output comes into regulation. Proper soft-start prevents output overshoot during start-up. Current drawn from the input supply is also well controlled. Notice that the inductor current, not the converter output voltage, is ramped during soft-start. Both soft-start capacitors are charged to a final voltage of about 2.4V. Overload / Short-Circuit Protection Each current limit comparator in the SC2620 limits the peak inductor current to 3.2A (typical). The regulator output voltage will fall if the load is increased above the current limit. If overload is detected (the output voltage falls below 70% of the set voltage), then the regulator will be shut off. An internal 0.8µA current sink starts to discharge the soft-start capacitor. As the soft-start capacitor is discharged below 1V, the discharge current source turns off and the soft-start capacitor is recharged with a 1.8µA current source. The regulator undergoes soft- start. During soft-start (1V < V SS < 2V), the overload shutdown latch in Figure 3 cannot be set. When V SS exceeds 2V, the set input of the overload latch is no longer blanked. If V FB is still below 0.7V, then the regulator will undergo shutdown and restart. The soft-start process should allow the output voltage to reach 70% of its final value before C SS is charged above 2V. Figures 9(a) and 9(b) show the timing diagrams of successful and failed start-up waveforms respectively. The soft-start interval should also be made sufficiently long so that the output voltage rises monotonically and it does not overshoot its final voltage by more than 5%. During normal soft-start, both the COMP voltage and the switch current limit gradually increase until the converter becomes regulated. If the regulator output is shorted to CONTROL1 CONTROL2 (b) ON OFF SC2620 PGOOD1 SS1 SS2 CSS1 CSS2 (a) SC2620 PGOOD1 SS1 SS2 CSS1 CSS2 ON OFF CONTROL1 ON OFF CONTROL2 TD M2 M1 Figure 10. Sequencing the Outputs by (a) Delaying Release of one Channel Relative to the Other and (b) Using PGOOD1 to Control Channel 2. |
|
|
ссылки URL |
| Вашему бизинису помогли Аллдатащит? [ DONATE ] |
Что такое Аллдатащит | реклама | контакт | Конфиденциальность | Ссылка на техническое описание | обмен ссыками | поиск по производителю All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |