| поискавой системы для электроныых деталей |
|
CFC2000B датащи(PDF) 7 Page - Clarke International |
|
|
|||||||||||||||||||||||||||||
CFC2000B датащи(HTML) 7 Page - Clarke International |
|
7 / 12 page ![]() 7 Parts & Service: 020 8988 7400 / E-mail: Parts@clarkeinternational.com or Service@clarkeinternational.com 2. Bolt the castor wheels to the base frame and leg extensions. The two smaller castors (24) locate at the middle of the assembly and the two larger items with brakes (35) are installed on the base frame (where the operator will use them). 3. Position the Main Support Post (4), over the holes provided, so that the Hydraulic Ram Assy bracket on the main support is facing towards the front wheels. Secure using bolts (20). 4. Connect the support bars (3), to their upper mountings at either side of the main support post with bolts (32). Connect the support bars to the Base with bolts (11), nuts and washers. Add the leg storage brackets (34) to the sides of the Base. Fully tighten all nuts and bolts assembled used so far. 5. Fit the Hydraulic Pump/Ram assembly (18), (with ram piston uppermost), into its mounting on the Main Support Post. Having lined up the hole in the bracket with that in the ram assembly, insert bolt (12) and tighten fully. Be careful not to over- tighten and clamp the pump/ram assembly. Allow the ram assembly to rest against the support post. 6. Lift the jib (1) into position in its mounting on top of the main support post and secure with bolt (10). 7. Raise the jib and manoeuvre the hydraulic ram assembly until the ram enters the bracket under the jib. Line up the holes in the bracket and ram and insert bolt (12). It may be necessary to extend the ram to facilitate its location. 8. To do this, ensure the control valve on the side of the ram assembly is closed by turning it firmly clockwise using the notched end of the pump handle. Pump the handle until the ram extends by the required amount. 9. Raise the jib to a horizontal position using the hydraulic ram and insert the Jib Extension (2) to any selected length (see OPERATION page 8). • Ensure that the slot at one end of the extension is outermost and on its underside. 10. Slide the jib extension in as far as convenient and secure in position with the R-clip provided. 11. Fit the chain and hook assembly (17) to the end of the jib extension by sliding the end chain link into the slot provided and threading the bolt (14) through the locating hole and chain link. 12. Finally check to ensure that all nuts are fully tightened and the hydraulic ram assembly, wheels and castors, all operate freely. NOTE: DO NOT OVERTIGHTEN ANY SECTION WHICH MAY CAUSE DISTORTION OR BINDING OF MOVING PARTS. |
|
|
ссылки URL |
| Вашему бизинису помогли Аллдатащит? [ DONATE ] |
Что такое Аллдатащит | реклама | контакт | Конфиденциальность | Ссылка на техническое описание | обмен ссыками | поиск по производителю All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |