поискавой системы для электроныых деталей
  Russian  ▼
ALLDATASHEETRU.COM

X  

720XP-2RU датащи(PDF) 5 Page - Arista Networks, Inc

номер детали 720XP-2RU
подробное описание детали  720XP Series 2 RU Cognitive Campus Switches
PDF  34 Pages
Scroll/Zoom Zoom In 100%  Zoom Out
производитель  ARISTA [Arista Networks, Inc]
домашняя страница  https://www.arista.com/en/
Logo ARISTA - Arista Networks, Inc

720XP-2RU датащи(HTML) 5 Page - Arista Networks, Inc

  720XP-2RU Datasheet HTML 1Page - Arista Networks, Inc 720XP-2RU Datasheet HTML 2Page - Arista Networks, Inc 720XP-2RU Datasheet HTML 3Page - Arista Networks, Inc 720XP-2RU Datasheet HTML 4Page - Arista Networks, Inc 720XP-2RU Datasheet HTML 5Page - Arista Networks, Inc 720XP-2RU Datasheet HTML 6Page - Arista Networks, Inc 720XP-2RU Datasheet HTML 7Page - Arista Networks, Inc 720XP-2RU Datasheet HTML 8Page - Arista Networks, Inc 720XP-2RU Datasheet HTML 9Page - Arista Networks, Inc Next Button
Zoom Inzoom in Zoom Outzoom out
 5 / 34 page
background image
Chapter
1
Overview
This chapter includes the following sections:
•
Scope
•
Receiving and Inspecting the Equipment
•
Installation Process
•
Safety Information
•
Obtaining Technical Assistance
•
Specifications
1.1
Scope
This guide is intended for properly trained service personnel and technicians who need to install the
following Arista Networks Cognitive Campus Switches:
CCS-720XP-96ZC2
Important:
Only qualified personnel should install, service, or replace this equipment.
Seul le personnel qualifié doit installer, service, ou remplacer cet équipement.
1.2
Receiving and Inspecting the Equipment
Upon receiving the switch, inspect the shipping boxes and record any external damage. Retain
packing materials if you suspect that part of the shipment is damaged; the carrier may need to inspect
them.
If the boxes were not damaged in transit, unpack them carefully. Ensure that you do not discard any
accessories that may be packaged in the same box as the main unit.
Inspect the packing list and confirm that you received all listed items. Compare the packing list with
your purchase order. Parts List provides a list of components included with the switch.
1.3
Installation Process
The following tasks are required to install and use the switch:
1. Select and prepare the installation site (Site Selection).
2. Assemble the installation tools (Tools and Parts Required for Installation).
3. Attach the mounting brackets (Attaching Mounting Brackets to the Chassis).
4. Install the switch in an equipment rack (Inserting the Switch into the Rack)
5. Connect the switch to the power source and network devices (Connecting Power Cables).
6. Configure the switch (Configuring the Switch).
Important:
1



Html Pages

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34


датащи скачать

Go To PDF Page


ссылки URL



Вашему бизинису помогли Аллдатащит?  [ DONATE ] 

Что такое Аллдатащит   |   реклама   |   контакт   |   Конфиденциальность   |   Ссылка на техническое описание    |   обмен ссыками   |   поиск по производителю
All Rights Reserved©Alldatasheet.com


Mirror Sites
English : Alldatasheet.com  |   English : Alldatasheet.net  |   Chinese : Alldatasheetcn.com  |   German : Alldatasheetde.com  |   Japanese : Alldatasheet.jp
Russian : Alldatasheetru.com  |   Korean : Alldatasheet.co.kr  |   Spanish : Alldatasheet.es  |   French : Alldatasheet.fr  |   Italian : Alldatasheetit.com
Portuguese : Alldatasheetpt.com  |   Polish : Alldatasheet.pl  |   Vietnamese : Alldatasheet.vn
Indian : Alldatasheet.in  |   Mexican : Alldatasheet.com.mx  |   British : Alldatasheet.co.uk  |   New Zealand : Alldatasheet.co.nz
Family Site : ic2ic.com  |   icmetro.com