| поискавой системы для электроныых деталей |
|
LTC2972 датащи(PDF) 40 Page - Linear Technology |
|
|
|||||||||||||||||||||||||||||
LTC2972 датащи(HTML) 40 Page - Linear Technology |
|
40 / 112 page ![]() LTC2972 40 2972fa For more information www.linear.com/LTC2972 MFR_CONFIG_LTC2972 Data Contents BIT(S) SYMBOL OPERATION b[1] Mfr_config_dac_gain DAC buffer gain. 0: Select DAC buffer gain dac_gain_0 (1.38V full-scale). 1: Select DAC buffer gain dac_gain_1 (2.65V full-scale). b[0] Mfr_config_ dac_pol DAC output polarity. 0: Encodes negative (inverting) DC/DC converter trim input. 1: Encodes positive (non-inverting) DC/DC converter trim input. Cascade Sequence ON with Time-Based Sequence OFF Cascade sequence ON allows a master power supply to sequence on a series of slave supplies by connecting each power supply’s power good output, or the LTC2972's configured PG pin, to the control pin of the next power supply, or LTC2972 channel, in the chain. Please note that the LTC2972's PWRGD pin should not be used for cascade sequenc- ing. Power good based cascade sequence OFF is not supported, OFF sequencing must be managed using immediate or time based sequence OFF. See also Tracking Based Sequencing section. Cascade sequence ON is illustrated in Figure 14. For each slave channel Mfr_config_cascade_on is asserted high and the associated control input is connected to the power good output of the previous power supply. In this configuration each slave channel’s startup is delayed until the previous supply has powered up. Cascade sequence OFF is not directly supported. Options for reversing the sequence when turning the supplies off include: • Using the OPERATION command to turn off all the channels with an appropriate off delay. • Using the FAULT pin to bring all the channels down immediately or in sequence with an appropriate off delay. When asserted, Mfr_config_cascade_on enables a slave channel to honor fault retries even when its control pin is low. Additionally, if the system has faulted off after zero or a finite number of retries, an OPERATION command may be used to turn all cascade channels off then on to clear the faulted off state when the slave’s control pin is low. For this reason we refer to the control pin as being redefined as a sequence pin. Figure 14. LTC2972 Configured to Cascade Sequence ON and Time-Base Sequence OFF PMBus COMMAND DESCRIPTION VOUTP RUN VOUTM VSENSEP0 VSENSEM0 POWERGOOD0 FAULTB0 FAULTB0 LTC2972 SLAVE MASTER CONTROL0 RECOMMENDED CONNECTION WHEN HARDWARE ON/OFF CONTROL IS REQUIRED VOUT_EN0 CONTROL1 CONTROL0 DC/DC LOAD VOUTP RUN VOUTM VSENSEP1 POWERGOOD1 VOUT_EN1 DC/DC LOAD TO NEXT CONTROL PIN 2972 F14 VSENSEM1 |
|
ссылки URL |
| Вашему бизинису помогли Аллдатащит? [ DONATE ] |
Что такое Аллдатащит | реклама | контакт | Конфиденциальность | Ссылка на техническое описание | обмен ссыками | поиск по производителю All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |