| поискавой системы для электроныых деталей |
|
QS10.481 датащи(PDF) 21 Page - PULS GmbH |
|
|
|||||||||||||||||||||||||||||
QS10.481 датащи(HTML) 21 Page - PULS GmbH |
|
21 / 27 page ![]() QS10.481, QS10.481-D1 Q-Series 48V, 5A, SINGLE PHASE INPUT 24. APPLICATION NOTES 24.1. REPETITIVE PULSE LOADING Typically, a load current is not constant and varies over time. This power supply is designed to support loads with a higher short-term power demand (=BonusPower®). The short-term duration is hardware controlled by an output power manager and is available on a repeated basis. If the BonusPower® load lasts longer than the hardware controller allows it, the output voltage will dip and the next BonusPower® is available after the BonusPower® recovery time (see chapter 6) has elapsed. To avoid this, the following rules must be met: a) The power demand of the pulse must be below 150% of the nominal output power. b) The duration of the pulse power must be shorter than the allowed BonusPower® time. (see output section) c) The average (R.M.S.) output current must be below the specified continuous output current. If the R.M.S. current is higher, the unit will respond with a thermal shut-down after a period of time. Use the maximum duty cycle curve (Fig. 24-2) to check if the average output current is below the nominal current. Fig. 24-1 Repetitive pulse loads, definitions Fig. 24-2 Max. duty cycle curve 150% 100 21/27 100% P PEAK T PEAK T 0 max. P 0 150% 0 0.2 0.4 0.6 0.8 1.0 DutyCycle 110 120 130 140 P 0 = 10% P 0 = 50% P 0 = 75% P 0 = 100% P PEAK P0 Base load (W) PPEAK Pulse load (above 100%) T0 Duration between pulses (s) TPEAK Pulse duration (s) DutyCycle T 0 = Tpeak - (DutyCycle x Tpeak) Tpeak + T0 Tpeak DutyCycle = Example: A load is powered continuously with 120W (= 50% of the rated output load). From time to time a peak power of 360W (= 150% of the rated output load) is needed for 1 second. The question is: How often can this pulse be supplied without overloading the power supply? - Make a vertical line at PPEAK = 150% and a horizontal line where the vertical line crosses the P0 = 50% curve. Read the max. duty cycle from the duty cycle-axis (= 0.37) - Calculate the required pause (base load) length T0: - Result: The required pause length = 1.7s - Max. repetition rate = pulse +pause length = 2.7s More examples for pulse load compatibility: PPEAK P0 TPEAK T0 PPEAK P0 TPEAK T0 360W 240W 1s >25s 360W 120W 0.1s >0.16s 360W 0W 1s >1.3s 360W 120W 1s >1.6s 300W 120W 1s > 0.75s 360W 120W 3s >4.9s DutyCycle T 0= Tpeak - (DutyCycle x Tpeak) 0.37 1s - (0.37 x 1s) == 1.7s Nov. 2011 / Rev. 2.1 DS-QS10.481-EN All parameters are specified at 48V, 5A, 230Vac, 25°C ambient and after a 5 minutes run-in time unless otherwise noted. www.pulspower.com Phone +49 89 9278 0 Germany |
|
|
ссылки URL |
| Вашему бизинису помогли Аллдатащит? [ DONATE ] |
Что такое Аллдатащит | реклама | контакт | Конфиденциальность | Ссылка на техническое описание | обмен ссыками | поиск по производителю All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |