поискавой системы для электроныых деталей
  Russian  ▼
ALLDATASHEETRU.COM

X  

AN2456 датащи(PDF) 3 Page - STMicroelectronics

номер детали AN2456
подробное описание детали  Protection of single battery voltage SLICs for new networks in US market
PDF  15 Pages
Scroll/Zoom Zoom In 100%  Zoom Out
производитель  STMICROELECTRONICS [STMicroelectronics]
домашняя страница  http://www.st.com
Logo STMICROELECTRONICS - STMicroelectronics

AN2456 датащи(HTML) 3 Page - STMicroelectronics

  AN2456 Datasheet HTML 1Page - STMicroelectronics AN2456 Datasheet HTML 2Page - STMicroelectronics AN2456 Datasheet HTML 3Page - STMicroelectronics AN2456 Datasheet HTML 4Page - STMicroelectronics AN2456 Datasheet HTML 5Page - STMicroelectronics AN2456 Datasheet HTML 6Page - STMicroelectronics AN2456 Datasheet HTML 7Page - STMicroelectronics AN2456 Datasheet HTML 8Page - STMicroelectronics AN2456 Datasheet HTML 9Page - STMicroelectronics Next Button
Zoom Inzoom in Zoom Outzoom out
 3 / 15 page
background image
AN2456
Telecom disturbances
3/15
1
Telecom disturbances
Figure 2 shows the different disturbances that may appear on the telecom line. Among
these, lightning and power crossing are the main considerations for wireline applications.
These disturbances are well defined in the country standards.
Figure 2.
Line disturbance causes
As the purpose of this application note is to illustrate the protection topology needed for
short line SLICs located in RT in customer premises in the US, the standard to be
considered for lightning and power crossing tests is the Telcordia GR1089 Intrabuilding
(equipment port type 4).
The Telcordia GR1089 specifies two acceptance criteria:
●
First level: the equipment shall continue to operate properly after the test.
●
Second level: the equipment may be damaged, but should not become a fire or
electrical hazard.
For intrabuilding equipment, however, only first level acceptance criterion need to be
satisfied for lightning tests.
Table 1 and Table 2 give the list of lightning and power crossing tests in the Telcordia
GR1089 intrabuilding standard for equipment port type 4.
Table 1.
Telecordia GR1089 intrabuilding lightning tests
Surge
Peak voltage
(V)
Peak current
(A)
Voltage and
current
waveforms
(µs)
Repetitions of
each polarity
Test
configuration(1)
1.
M: metallic; L: longitudinal
1
±800
100
2/10
1
M (on tip and ring)
2
±1500
100
2/10
1
L
Remote
Terminal
Central office
Short
line
SLIC
Subscriber
Location
Atmospheric effects (Lightning)
50/60Hz mains disturbances
Electrostatic discharges
POTS
Protection
Protection



Html Pages

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15


датащи скачать

Go To PDF Page


ссылки URL



Вашему бизинису помогли Аллдатащит?  [ DONATE ] 

Что такое Аллдатащит   |   реклама   |   контакт   |   Конфиденциальность   |   Ссылка на техническое описание    |   обмен ссыками   |   поиск по производителю
All Rights Reserved©Alldatasheet.com


Mirror Sites
English : Alldatasheet.com  |   English : Alldatasheet.net  |   Chinese : Alldatasheetcn.com  |   German : Alldatasheetde.com  |   Japanese : Alldatasheet.jp
Russian : Alldatasheetru.com  |   Korean : Alldatasheet.co.kr  |   Spanish : Alldatasheet.es  |   French : Alldatasheet.fr  |   Italian : Alldatasheetit.com
Portuguese : Alldatasheetpt.com  |   Polish : Alldatasheet.pl  |   Vietnamese : Alldatasheet.vn
Indian : Alldatasheet.in  |   Mexican : Alldatasheet.com.mx  |   British : Alldatasheet.co.uk  |   New Zealand : Alldatasheet.co.nz
Family Site : ic2ic.com  |   icmetro.com