| поискавой системы для электроныых деталей |
|
AN3028 датащи(PDF) 33 Page - STMicroelectronics |
|
|
|||||||||||||||||||||||||||||
AN3028 датащи(HTML) 33 Page - STMicroelectronics |
|
33 / 37 page ![]() AN3028 Test equipment and measurement of efficiency and low-load performance Doc ID 16135 Rev 1 33/37 least 30 minutes (warm-up period) immediately prior to conducting efficiency measurements. After this warm-up period, the AC input power shall be monitored for a period of 5 minutes to assess the stability of the UUT. If the power level does not drift by more than 5% from the maximum value observed, the UUT can be considered stable and the measurements can be recorded at the end of the 5-minute period. If AC input power is not stable over a 5-minute period, the average power or accumulated energy shall be measured over time for both AC input and DC output. Some wattmeter models allow integrating the measured input power in a time range and then measuring the energy absorbed by the UUT during the integration time. The average input power is calculated by dividing by the integration time itself. Figure 34. Connections of the UUT to the wattmeter for power measurements A V DISPLAY X AVG WATT METER 1 2 AC SOURCE U.U.T (Unit Under test) INPUT Multiplier Voltmeter Ammeter OUTPUT + Switch |
|
ссылки URL |
| Вашему бизинису помогли Аллдатащит? [ DONATE ] |
Что такое Аллдатащит | реклама | контакт | Конфиденциальность | Ссылка на техническое описание | обмен ссыками | поиск по производителю All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |