| поискавой системы для электроныых деталей |
|
MP2612 датащи(PDF) 10 Page - Monolithic Power Systems |
|
|
|||||||||||||||||||||||||||||
MP2612 датащи(HTML) 10 Page - Monolithic Power Systems |
|
10 / 20 page ![]() MP2612 – 2A, 24V INPUT, 600kHz 2-3CELL SWITCHING LI-ION BATTERY CHARGER MP2612 Rev. 1.0 www.MonolithicPower.com 10 9/7/2011 MPS Proprietary Information. Patent Protected. Unauthorized Photocopy and Duplication Prohibited. © 2011 MPS. All Rights Reserved. PIN FUNCTIONS Pin # Name Description 1 NTC Thermistor Input. Connect a resistor from this pin to the pin VREF33 and the Thermistor from this pin to ground. 2 ACOK Valid Input Supply Indicator. A logic LOW on this pin indicates the presence of a valid input supply. 3 CHGOK Charging Completion Indicator. A logic LOW indicates charging operation. The pin will become an open drain once the charging is complete. 4 VREF33 Internal linear regulator 3.3V reference output. Bypass to GND with a 1μF ceramic capacitor. 5 VREF25 Internal linear 2.5V reference circuit. PLEASE KEEP THIS PIN FLOATING. 6 EN On/Off Control Input. 7 CELLS Command Input for the number of Li-Ion Cells. Connect this pin to VREF33 for 3-cell operation or ground the pin for 2-cell operation. DO NOT LEAVE THIS PIN FLOAT. 8 COMPV V-LOOP Compensation. Decouple this pin with a capacitor and a resistor. 9 COMPI I-LOOP Compensation. Decouple this pin with a capacitor and a resistor. 10 BATT Positive Battery Terminal. 11 CSP Battery Current Sense Positive Input. Connect a resistor RSEN between CSP and BATT. The full charge current is: mΩ RS1 200mV A I CHG . 12 GND Ground. This pin is the voltage reference for the regulated output voltage. For this reason care must be taken in its layout. This node should be placed outside of the switching diode (D2) to the input ground path to prevent switching current spikes from inducing voltage noise into the part. 13 TMR Set time constant. 0.1uA current charges and discharges the external cap. 14 BST Bootstrap. This capacitor is needed to drive the power switch’s gate above the supply voltage. It is connected between SW and BS pins to form a floating supply across the power switch driver. 15 SW Switch Output. 16 IN Supply Voltage. The MP2612 operates from a 9V to 24V unregulated input to charge 2~3 cell li-ion battery. Capacitor is needed to prevent large voltage spikes from appearing at the input. |
|
|
ссылки URL |
| Вашему бизинису помогли Аллдатащит? [ DONATE ] |
Что такое Аллдатащит | реклама | контакт | Конфиденциальность | Ссылка на техническое описание | обмен ссыками | поиск по производителю All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |