| поискавой системы для электроныых деталей |
|
ICE3AS02 датащи(PDF) 9 Page - Infineon Technologies AG |
|
|
|||||||||||||||||||||||||||||
ICE3AS02 датащи(HTML) 9 Page - Infineon Technologies AG |
|
9 / 23 page ![]() F3 ICE3AS02 / ICE3AS02G / ICE3BS02 / ICE3BS02G Functional Description Version 1.1 9 21 May 2004 Once the malfunction condition is removed, this block will then turn back on. The recovery from Auto Restart Mode does not require disconnecting the SMPS from the AC line. When Active Burst Mode is entered, the internal Bias is switched off in order to reduce the current consumption to below 1.05mA while keeping the Voltage Reference active as this is necessary in this mode. 3.3 Startup Phase Figure 5 Soft Start At the beginning of the Startup Phase, the IC provides a Soft Start duration whereby it controls the maximum primary current by means of a duty cycle limitation. A signal V SoftS which is generated by the external capacitor C Softs in combination with the internal pull up resistor R SoftS, determines the duty cycle until VSoftS exceeds 4V. When the Soft Start begins, C SoftS is immediately charged up to approx. 1V by T2. Therefore the Soft Start Phase takes place between 1V and 4V. Above V SoftsS = 4V there is no longer duty cycle limitation DC max which is controlled by comparator C7 since comparator C2 blocks the gate G7 (see Figure 5). The maximum charge current in the very first stage when V SoftS is below 1V, is limited to 1.32mA. Figure 6 Startup Phase By means of this extra charge stage, there is no delay in the beginning of the Startup Phase when there is still no switching. Furthermore Soft Start is finished at 4V to have faster the maximum power capability. The duty cycles DC 1 and DC2 are depending on the mains and the primary inductance of the transformer. The limitation of the primary current by DC 2 is related to V SoftS = 4V. But DC1 is related to a maximum primary current which is limited by the internal Current Limiting with CS = 1V. Therefore the maximum Startup Phase is divided into a Soft Start Phase until t1 and a phase from t1 until t2 where maximum power is provided if demanded by the FB signal. Soft-Start Comparator Soft Start & G7 C7 C SoftS R SoftS T2 3.25k 6.5V T3 1V SoftS Gate Driver 0.85V x3.7 PWMOP CS 4V C2 DC max DC 1 DC 2 t t V SoftS max. Soft Start Phase 1V 4V 5.4V max. StartupPhase t1 t2 |
|
|
ссылки URL |
| Вашему бизинису помогли Аллдатащит? [ DONATE ] |
Что такое Аллдатащит | реклама | контакт | Конфиденциальность | Ссылка на техническое описание | обмен ссыками | поиск по производителю All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |