| поискавой системы для электроныых деталей |
|
SC2616 датащи(PDF) 11 Page - Semtech Corporation |
|
|
|||||||||||||||||||||||||||||
SC2616 датащи(HTML) 11 Page - Semtech Corporation |
|
11 / 17 page ![]() 11 2003 Semtech Corp. www.semtech.com POWER MANAGEMENT SC2616 Applications Information Description The Semtech SC2616 DDR power supply controller is the latest and most complete switching and linear regulator combination, providing the necessary functions to comply with S3 and S5 sleep state signals generated by the Desktop Computer Motherboards. VDDQ supply, and VTT termination voltage are supplied to the Memory bus during S0 (normal operation) state. During S0, VDDQ is supplied via the Switching regulator, sourcing high output currents to the VDD bus as well as supplying the termination supply current. The SC2616 is capable of driving a 4000pf capacitor in 25ns (typical, top gate). This drive capability allows 15-20A DC load on the VDDQ supply. The VTT termination voltage is an internal sink/ source linear regulator, which during S0 state receives its power from the VDDQ bus. It is capable of sourcing and sinking 2 Amps (max). The current limit on this pin is set to 3 Amps (typical). Output Current and PCB layout The current handling capacity of SC2616 depends upon the amount of heat the PC board can sink from the SC2616 thermal pad. (See mounting instructions). The PC board layout must take into consideration the high current paths, and ground returns for both the VDDQ and VTT supply pins. VTT, LGND, VDDQ, 5VCC and PGND traces must also be routed using wide traces to minimize power loss and heat in these traces, based on the current handling requirements. S3 and S5 States During S3 and S5 sleep states, the operation of the VDDQ and VTT supplies is governed by the internal sequencing logic in strict adherence with motherboard specifications. The timing diagram demonstrates the state of the controller, and each of the VDDQ and VTT supplies during S3 and S5 transitions. When S3 is low, the VDDQ supplies the “Suspend To RAM” current of 650 mA (min) to maintain the information in memory while in standby mode. The VTT termination voltage is not needed during this state, and is thus tri-stated during S3. Once S3 goes high, the VDDQ switcher recovers and takes control of the VDDQ supply voltage. When S5 and S3 are pulled low, all supplies shut down. The SS/EN pin must be pulled low (<0.3V) and high again to restart the SC2616. This can be achieved by cycling the input supplies, 5V and 12V since both supplies have to be higher than their UVLO thresholds for proper start-up. Initial Conditions and Event Sequencing The main switcher will start-up in Asynchronous Mode when the voltage on SS/EN pin is greater than ~0.3V. The SS/EN will go high only after the 5Vcc and 12Vcc are higher than their respective UVLO thresholds. The switcher achieves maximum duty cycle when SS/EN reaches 0.8V. When the SS/EN equals 1.25V, the synchronous FET will also be activated. When the S5 and S3 go high for the first time, the VDDQ is supplied by the switcher, thus removing the burden of charging the output capacitors via the linear regulator. An internal latch guarantees that the supply goes through S0 state for the first time. During a transition from S3 to S0, where the 5V and 12V rails and subsequently the SS/EN pin go high, the internal VDDQ standby supply will remain ”on” until SS/EN has reached 1V, at which point only the switcher is supplying VDDQ , andthe internal “power good” indicator goes high. The “Memory” activity should be slaved off the “Power OK” signal from the Silver Box supply, and since the “Power OK” is asserted after all supplies are within close tolerance of their final values, the VDDQ switcher should have been running for some time before the memory is activated. This is true for typical SS/EN capacitor values (10nf to 220nf). Thus during transitions from S3 to S0, the concern that the VDDQ Standby supply may have to provide high currents before the switcher is activated is alleviated. The logic inputs to S3 and S5 pins must be defined before application of power to the SC2616. This can be guaranteed by pulling up the S3 and S5 inputs to 5VStandby. If the chipset that asserts these signals is powered after the SC2616 powers up, and S3 and S5 are not pulled up, erroneous startup and operation can result. Care must be taken not to exceed the maximum voltage/ current specifications on to the interface supplying these signals. The pullup voltage and resistor must be chosen such that when high, the S3 and S5 do not “back drive” |
|
|
ссылки URL |
| Вашему бизинису помогли Аллдатащит? [ DONATE ] |
Что такое Аллдатащит | реклама | контакт | Конфиденциальность | Ссылка на техническое описание | обмен ссыками | поиск по производителю All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |